Design Build Fly

Contest Site: www.aiaadbf.org

Recent DBF Announcements

  • Manufacturing Schedule NO NEED FOR THIS, GANNT CHART ALREADY COMPLETED (LOEBEL)The attached Excel file contains a table with dates for the manufacturing process and a Gantt chart to illustrate the durations
    Posted Feb 25, 2010 7:50 PM by William Lubelski
  • 5.6 Mission Performance for Final Design Used general format from the 2008-2009 report.  Make sure information is accurate. 5.6 Mission Performance for Final Design ********************** SISTI CHECK THIS SECTIONS FOR ACCURACY...I DON'T REALLY ...
    Posted Feb 25, 2010 7:48 PM by William Lubelski
  • 7. Testing Plan The flight plan is attached but the check boxes might not work so you might have to reformat those. 
    Posted Feb 25, 2010 5:52 PM by William Lubelski